Park Inn Tower Berlin: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
Line 9: Line 9:
*'''Version 1C (September 25, 2023; Finished on September 26, 2023)''': Created signs & changed height on the lobby floors
*'''Version 1C (September 25, 2023; Finished on September 26, 2023)''': Created signs & changed height on the lobby floors
*'''Version 2 (February 22, 2024; Finished on February 23, 2024)''': Correcting the height to 410 ft + Adding additional room for the logo
*'''Version 2 (February 22, 2024; Finished on February 23, 2024)''': Correcting the height to 410 ft + Adding additional room for the logo
*'''Version 3 (TBA)''': Roof improvements, antenna addition
*'''Version 3 (TBA)''': Roof color changes, antenna addition


== Floors ==
== Floors ==

Revision as of 02:50, 4 May 2024

Park Inn Hotel Berlin (during the completion)
This article is legitimate.
It contains good-faith information, such as an existing building or content.
This simulated building may represent a real one.

This place's creator, LF, created this simulation only
because of liking the real place and to keep that place in memory.

There is no intention to publicize anything that real authorities do not want the public to do so.

To real-life parties: If you really want this building to be removed, please contact the creator
with a very good reason, and if possible, with an absolute proof of your relations to the real place.

Park Inn Tower Berlin is a 40-storey hotel created by Lighthouse Friesland, But a few of them (cab look, etc.) are modified. Also, It is based on Berlin (the capital city of Germany)'s second highest building called Park Inn by Radisson Berlin Alexanderplatz. It has 12 elevators (one of them is a glass elevator). Four of them are low-rise elevators, four of them are high-rise elevators, and three of them are service elevators. All elevators excluding the glass elevator are Schindler M-Series Elevators.

Updates

  • Version 1A (August 27, 2023): Initial Release
  • Version 1B (Unknown date): Modified buttons, cab look, ceiling, etc.
  • Version 1C (September 25, 2023; Finished on September 26, 2023): Created signs & changed height on the lobby floors
  • Version 2 (February 22, 2024; Finished on February 23, 2024): Correcting the height to 410 ft + Adding additional room for the logo
  • Version 3 (TBA): Roof color changes, antenna addition

Floors

Park Inn Hotel Berlin (after the completion)
  • 1-3 - Lobby
  • 4 - Lower Service Area
  • 5-20 - Lower Zone Hotel Rooms
  • 20-35 - Upper Zone Hotel Rooms
  • 36 - Mid Service Area
  • 37 - Upper Zone Hotel Rooms
  • 38-39 - Upper Service Areas
  • 40 - Roof (including the Panorama terrace)

Download links

NOTE: The download links are outdated, so please consider downloading the LF Integration Project for the building and it's custom data.

See also

External links