25th Street Medical offices and Pharmacy: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
m (Reverted edit by Lighthouse Friesland (talk) to last revision by Abigail)
Tag: Rollback
(Project has been cancelled as I plan to make a new, somewhat larger building on a more solid foundation.)
Line 1: Line 1:
The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by [[User:Abigail|Abigail]], there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th Street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.  
The Republic Department of Health 25th Street Medical Office and Pharmacy building was an in-development building created by [[User:Abigail|Abigail]], there were plans for 3 floors and 2 elevators. the building was to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th Street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.  
[[File:25th st front plan.png|alt=A Front View of Future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]]
[[File:25th st front plan.png|alt=A Front View of Future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]]
Dev Screenshots are to follow eventually.  
Dev Screenshots are to follow eventually.  
Line 10: Line 10:


== Development plans ==
== Development plans ==
Release is expected by January 2025, however, this is not exact. Release may come sooner or later than expected. Unfinished BLD files may be provided upon request.
Release was expected in January 2025 but was cancelled in December 2024 due to issues in Abigail's life. 25th Street is planned to have a spiritual successor in the form of the Northern Technologies Building.
The Project Is currently in Phase I.


== Development Phases ==
== Development Phases ==
Line 28: Line 27:
== See also ==
== See also ==
* [[EG881 Integration Project]]
* [[EG881 Integration Project]]
* [[Azure City]]


[[Category:Buildings]]
[[Category:Buildings]]
[[Category:Abigail's buildings]]
[[Category:Abigail's buildings]]
[[Category:Hospitals]]
[[Category:Hospitals]]
[[Category:Azure City]]

Revision as of 09:31, 18 December 2024

The Republic Department of Health 25th Street Medical Office and Pharmacy building was an in-development building created by Abigail, there were plans for 3 floors and 2 elevators. the building was to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th Street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.

A Front View of Future Construction plans, at this time only the ground level (excluding support pillar) has been built
A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built

Dev Screenshots are to follow eventually.

Screenshots

Development plans

Release was expected in January 2025 but was cancelled in December 2024 due to issues in Abigail's life. 25th Street is planned to have a spiritual successor in the form of the Northern Technologies Building.

Development Phases

  • Phase I - Structural, consisting of the building's floors, doors, textures, and minor/moderate details.
  • Phase II - Elevators and Signage.
  • Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before Phase III begins.
  • Phase IV - Release/Refinement. By this point, the building will have a full public release available.

Floors

  • K - Basement, Machine rooms, Storage, Servers (Room added, currently inaccessible)
  • L - Lobby, Storage, Pharmacy (Phase I complete)
  • 1 - Offices, Storage (Interfloor Area WIP)
  • 2 - Doctor's exam rooms, Waiting room, offices (Not yet added)
  • R - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added)

See also