Northeast Triad Convention Center: Difference between revisions
Jump to navigation
Jump to search
MelvinMan10 (talk | contribs) |
MelvinMan10 (talk | contribs) |
||
Line 24: | Line 24: | ||
''Exits to street are available on the 2<sup>nd</sup> floor.'' | ''Exits to street are available on the 2<sup>nd</sup> floor.'' | ||
* '''P4-P1''' - Underground Parking | * '''P4-P1''' - Underground Parking | ||
* '''1-<abbr title="Roof level.">8</abbr>''' - | * '''1-<abbr title="Roof level.">8</abbr>''' - Parking (Bridge to Convention Center on level 5) | ||
=== Central Parking Garage === | === Central Parking Garage === | ||
* '''1-4''' - Aboveground Parking (Exit to street on level 2) | * '''1-4''' - Aboveground Parking (Exit to street on level 2) |
Revision as of 09:38, 6 February 2025
It contains good-faith information, such as an existing building or content. |
This article describes a building that is currently part of the EG881 Integration Project by EG881. It can be found here on the Skyscraper Simulator Forum. |
---|
Northeast Triad Convention Center is a complex of buildings made by escalatorgeek881 (EG881). This place is located south of downtown Andersville. It consists of the 26-floor Cityview Office Tower (Octagon Plaza), the 10-floor South Convention Center, the 8-floor North Parking Garage, the currently empty Palmetto Building, the nearby 7-floor Doolittle Street Parking Garage and the Doolittle Meridian Center next to Doolittle St. Garage. There are a total of 52 elevators in the entire complex.
Floors
Cityview Tower
- SB - Sub-Basement (Lower service area)
- B - Basement
- 1 - Ground Entrance / Service Area
- 2 - Lobby
- 3-4 - Mezzanine (access to Main Parking Garage)
- 5-9 - Meeting rooms (access to South Convention Center on levels 4 and 5)
- 10-25 - Offices
- 26 - Trapezoid Restaurant
- R - Roof
Convention Center
- B - Gibson Auditorium
- 1 - Empty / Service Area
- 2 - Lobby and Convention Center
- 3-9 - Convention Center (access to Central Parking Garage on levels 2-4; Cityview Tower on level 5)
- 10 - Edinburgh Room, Norpoint Room, service area, lower roof
- 11 - Upper roof
North Parking Garage
Exits to street are available on the 2nd floor.
- P4-P1 - Underground Parking
- 1-8 - Parking (Bridge to Convention Center on level 5)
Central Parking Garage
- 1-4 - Aboveground Parking (Exit to street on level 2)
- 5 - Convention Center Atrium
Doolittle Street Parking Garage
Exits to street are available on the 2nd and 5th floors.
- 1 - Underground Parking
- 2-7 - Parking (Access to Doolittle Meridian Center on levels 2-3)
Doolittle Meridian Center
- 1 - Lobby, loading dock, walkway to Doolittle St. Garage
- 2 - Offices, Bridge to Doolittle St. Garage
- 3-19 - Offices