25th Street Medical offices and Pharmacy: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
(planning some things, might add curves and stuff eventually)
(Added info on what my plans will be, these could be delayed depending on personal circumstances.)
Line 2: Line 2:
[[File:25th st front plan.png|alt=A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]]
[[File:25th st front plan.png|alt=A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]]
Dev Screenshots are to follow eventually.  
Dev Screenshots are to follow eventually.  
== Development plans ==
Release is expected by January 2025, however it may take longer if conditions change. Unfinished BLD files may be provided upon request.
The Project is Currently in Phase I - Structural, this consists of the building's floors, doors, and some minor/moderate details.
Phase II will consist of Elevators and Signage.
Phase III, the final phase may take the longest, as modelling various furniture could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before phase III begins.
== Floors ==
== Floors ==
* '''G''' - Lobby, Storage, Pharmacy
* '''G''' - Lobby, Storage, Pharmacy

Revision as of 10:32, 19 March 2024

The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by Abigail, there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, and may include integration projects to allow for curves and superior texture handling. it is planned to be a representation of how the 25th street Pharmacy would have looked in June of 1979, Four months after it's canonical construction finished.

A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built
A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built

Dev Screenshots are to follow eventually.

Development plans

Release is expected by January 2025, however it may take longer if conditions change. Unfinished BLD files may be provided upon request. The Project is Currently in Phase I - Structural, this consists of the building's floors, doors, and some minor/moderate details. Phase II will consist of Elevators and Signage. Phase III, the final phase may take the longest, as modelling various furniture could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before phase III begins.

Floors

  • G - Lobby, Storage, Pharmacy
  • 1 - Offices, Storage
  • 2 - Doctor's exam rooms, Waiting room, offices
  • R - Roof top, Maintenance, AzureNet Radio uplink