Twin Towers
The title of this article is ambiguous. Further meanings are listed under World Trade Center (disambiguation). |
It contains good-faith information, such as an existing building or content. |
This article describes a building that is part of the Extreme MEGAProjects by Skyscraper Simulator Showcase. It can be found here on the Skyscraper Simulator Forum. |
---|
This place's creator, Skyscraper Simulator Showcase, created this simulation only There is no intention to publicize anything that real authorities do not want the public to do so. To real-life parties: If you really want this building to be removed, please contact the creatorwith a very good reason, and if possible, with an absolute proof of your relations to the real place. |
The Twin Towers are a recreation to the two towers of the World Trade Center (WTC) made by Skyscraper Simulator Showcase / June. Twin Towers is strictly based on the former World Trade Center twin towers prior to the September 11th (9/11) attacks . The two towers have a total of 99 elevators each, making a total of 198 elevators. With the exception of the realistic version, it's a building made in SVN style (except the windows). Currently there aren't any of the other buildings of the WTC complex.
Updates (Simplified)
- Initial Release - September 29, 2023
- Release 101323 - October 13, 2023
- Release 102023 - October 20, 2023
- Release 110323 - November 3, 2023
- Release 011224 - January 12, 2024
Updates (Realistic)
There is no Milestone 5 version released.
- Milestone 1 - November 7, 2023; Finish date December 1, 2023
- Milestone 2 - December 4, 2023; Finish date December 29, 2023
- Milestone 3 - January 3, 2024; Finish date January 28, 2024
- Milestone 4 - March 7, 2024; Finish date March 8, 2024
- Milestone 6 - June 4, 2024; Finish date June 7, 2024
Floors
Zone 1
- PIT - Shaft Pit
- SB5-SB1 - Sub Basements
- S - Lower Level*
- C - Concourse (Main Lobby)
- P - Mezzanine / Plaza
- 2-6 - Upper Lobby Levels
- 7-8 - Zone L Mechanical
- 9-40 - Zone 1 Offices
- 41-42 - Zone 1 Mechanical
Zone 2
- 43 - Zone 2 Offices
- 44 - Zone 2 Skylobby
- 45-74 - Zone 2 Offices
- 75-76 - Zone 2 Mechanical
Zone 3
- 77 - Zone 3 Offices
- 78 - Zone 3 Skylobby
- 79-105 - Zone 3 Offices (WTC1) / 79-106 - Zone 3 Offices (WTC2)
- 106-107 - Restaurant (WTC1) / Floor 107 - Indoor Observatory (WTC2)
- 108-109 - Zone 3 Mechanical
- 110 - Communications (WTC1) / Access to Outdoor Observatory (WTC2)
- R1 - Rooftop
- R2 - Outdoor Observatory* (WTC2)
*Prior to version Milestone 3, there was no R2 floor. Also the simplified version has no R2 floor.
Stairwell Transfering Floors
North Tower
- Stairwell A - Floors 26, 42, 48, 66, 68, 76, and 82
- Stairwell B - Floor 76
- Stairwell C - Floors 42, 48, 66, 68, 76, 82, and 110
South Tower
- Stairwell A - Floors 26, 42, 48, 76, and 82
- Stairwell B - Floor 76
- Stairwell C - Floors 42, 48, 76, 82, and 110
*Prior to versions 011224 and Milestone 3, the South Tower stairwells were identical to the North Tower
Gallery
Simplified
- NOTE: These screenshots were made in the 1st version
-
Exterior of the Twin Towers
-
Concourse Level
-
78th floor skylobby
Realistic
NOTE: We moved the screenshots to Twin Towers (Realistic) Screenshots a while ago because it's too many.
Read more: Twin Towers (Realistic) Screenshots