25th Street Medical offices and Pharmacy

From Skyscraper Wiki
Revision as of 05:37, 22 March 2024 by 38.140.156.194 (talk) (→‎Development plans: might go faster than I thought, on the other hand, might not.)
Jump to navigation Jump to search

The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by Abigail, there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.

A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built
A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built

Dev Screenshots are to follow eventually.

Screenshots

Development plans

Release is expected by January 2025, however, this is not exact. Release may come sooner or later than expected. Unfinished BLD files may be provided upon request. The Project Is currently in Phase I.

Development Phases

  • Phase I - Structural, this consists of the building's floors, doors, and some minor/moderate details.
  • Phase II - Elevators and Signage.
  • Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before phase III begins.
  • Phase IV - Release/Refinement. By this point, the building will have a full public release available.

Floors

  • K - Basement, Machine rooms, Storage, Servers (Not yet added)
  • L - Lobby, Storage, Pharmacy (Phase I complete)
  • 1 - Offices, Storage (Not yet added)
  • 2 - Doctor's exam rooms, Waiting room, offices (Not yet added)
  • R - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added)

See also